PORT BERTHS

THE
BERTHS

The Port of Brighton has three berths which can accommodate a variety of vessel operations
 

  • Berth 1 – supports offshore maintenance activity
  • Berth 2 - the largest of the three berths, supports the export of methanol from the petrochemicals complex on the Union Industrial Estate
  • Berth 3 - can accommodate vessels of up to 190m
 

For more information on each berth, see the table below.
 

Berth 1

Berth 1 was constructed in 1995 and is 60 metres long. This Berth’s reconstruction commenced in 2007/2008 and was completed in 2009.

   
Port Facility   Capacity Value
Berth 1 Length of Dock 60m
  Width of Dock 30m
  Maximum DWT of Vessel 18,000 DWT
  Length of Vessel that can be accommodated 60m
  Depth of Water 7.5m (CD)
Temporary Storage Marshalling Area – serviced with electricity, water supply. Security fencing and high mast lighting 5000m2

 